Case Study

Commercial Office Air Conditioning Installation

Newton Electrical & Mechanical Ltd were appointed to design, supply and install air conditioning for two newly created offices within a large open-plan commercial workspace in Beaumont Leys, Leicester.

Beaumont Leys, Leicester

Two Newly Created Office Spaces in Beaumont Leys, Leicester, One Tailored Daikin Climate Control Solution Delivered Across Six Working Days

Newton Electrical & Mechanical Ltd were appointed to design, supply and install air conditioning for two newly created offices within a large open-plan commercial workspace in Beaumont Leys, Leicester. The project involved reconfiguring an existing Daikin VRV system to serve the new layout, relocating and right-sizing equipment to match the spaces created, and installing a new dedicated power supply, all delivered within a planned programme of six working days and with minimal disruption to the wider team.

This was a commercial installation where precision, coordination and the right equipment specification all mattered. Two private offices had been partitioned out of the main open-plan area, each requiring its own properly sized climate control solution. The existing 10kw VRV cassette, originally serving the open-plan space, was replaced with a correctly sized 5kw unit and relocated into office one. A new 5kw single split unit was installed in office two. Throughout, 600×600 ceiling tile cassettes were specified to complement the existing small offices elsewhere in the building, keeping the finish consistent and professional.

We were pleased to take on a project that required this level of planning and care, and to deliver a result that genuinely improved the working environment for the people using those spaces every day.

 

Project Brief

The client asked Newton Electrical & Mechanical Ltd to create a practical, comfortable and properly specified air conditioning solution for two newly created office spaces, partitioned from within a large open-plan area on the first floor of their commercial premises in Beaumont Leys, Leicester.

The brief was clear:

  • Reconfigure the existing VRV system to suit the new office layout
  • Replace the oversized 10kw cassette with a correctly sized 5kw unit and relocate it into office one
  • Supply and install a new 5kw single split unit for office two
  • Specify 600×600 ceiling tile cassettes to match the standard set by other offices in the building
  • Install a dedicated power supply for the new single split unit
  • Deliver the full scope within a six working day programme
  • Coordinate the works to minimise disruption to staff and day-to-day operations

The building was in active use throughout. That made programme management and clear communication with the client just as important as the technical installation itself.

 

The Challenge

Commercial office air conditioning reconfigurations are rarely straightforward, and this project presented a number of specific challenges from the outset.

Reconfiguring an open-plan VRV system for new enclosed spaces. The existing 10kw VRV cassette had been sized and positioned to serve a large open-plan office. Once two private offices were created within that space, the original arrangement was no longer fit for purpose. The unit was oversized for the individual rooms, and its position no longer made sense for the new layout. A full reconfiguration was needed, not just a like-for-like swap.

Right-sizing the equipment. Running a 10kw unit in a smaller enclosed office leads to short-cycling, poor humidity control and unnecessary energy consumption. Replacing it with a correctly sized 5kw cassette and relocating it into office one was essential to achieving reliable, efficient performance in the reconfigured space.

Providing climate control for a second office with no existing provision. Office two had been newly created and had no air conditioning at all. A new 5kw single split unit was required, along with pipework routed through the office and out onto the flat roof, keeping the installation clean and unobtrusive.

Maintaining a consistent finish across the building. The building already had a number of smaller offices with their own air conditioning installations. To ensure a consistent look, 600×600 ceiling tile cassettes were specified for both new offices, matching the profile and appearance of the units already installed elsewhere in the building.

Power supply from a remote distribution board. The new single split unit required a dedicated electrical supply routed back to the existing distribution boards in the manufacturing area of the building. This meant working across different zones of the premises to deliver a compliant and correctly rated installation.

Ceiling access in an occupied building. The works required access through ceiling voids at height across both offices. Staff needed to temporarily relocate during the high-level works, which required careful scheduling and clear communication to keep disruption to a minimum and the programme on track.

 

Our Solution

Newton Electrical & Mechanical Ltd designed a solution that addressed both offices fully within the six working day programme, using Daikin equipment throughout.

Office One: Relocated and reconfigured VRV cassette

The existing 10kw Daikin VRV ceiling cassette was removed from its original position in the open-plan office. A correctly sized 5kw cassette was installed in its place and relocated into office one, with the pipework repiped back to the VRV BS box. A 600×600 ceiling tile cassette was specified to sit flush with the existing ceiling grid, complementing the other small offices within the building. An additional wall-mounted controller was also provided, giving occupants direct, intuitive control over their environment.

Office Two: New single split AC unit

A new 5kw Daikin single split air conditioning unit was supplied and installed in office two. A 600×600 ceiling tile cassette was again specified to maintain a consistent finish across the floor. Pipework was routed neatly through the office and out onto the flat roof, keeping the installation unobtrusive. Operating independently of the VRV system, this unit gives the occupants a reliable and self-contained climate control solution.

Power supply

A new dedicated power supply was installed from the new single split unit back to the existing distribution boards within the manufacturing area, ensuring a safe, correctly rated and fully compliant electrical connection.

Coordination and programme management

Before works commenced, arrangements were made for staff to vacate the affected areas while the high-level ceiling access work was carried out. This allowed the installation to progress safely and without unnecessary delay, keeping the project on programme and the client’s team as comfortable as possible throughout.

 

Spaces Covered

The air conditioning installation was designed to provide proper climate control across both newly created offices, with each space receiving a solution matched to its size, layout and usage requirements.

  • Office One — Correctly sized 5kw Daikin VRV ceiling cassette (600×600), relocated from the open-plan area, repiped to the VRV BS box, with a new wall-mounted controller
  • Office Two — New 5kw Daikin single split air conditioning unit with a 600×600 ceiling tile cassette, with pipework routed to the flat roof

Both spaces were left fully operational, tested and commissioned on completion.

 

Installation Details

Our role covered the full design, supply and installation of the air conditioning solution across both offices.

Working within the constraints of an active commercial building, we planned and sequenced the works to limit the impact on staff and the wider operation. Every decision, from equipment selection to pipework routing and ceiling access timing, was made with the programme and the client’s team in mind.

Key elements of the project included:

  • Removal of the existing 10kw VRV cassette from the open-plan office
  • Supply and installation of a correctly sized 5kw Daikin VRV cassette, relocated into office one
  • Repiping of the reconfigured cassette back to the VRV BS box
  • Supply and installation of a new 5kw Daikin single split air conditioning unit in office two
  • 600×600 ceiling tile cassettes specified for both offices to complement the existing building finish
  • Pipework routed through office two and onto the flat roof
  • Supply and installation of an additional wall-mounted controller for office one
  • Installation of a new dedicated power supply back to the existing distribution boards in the manufacturing area
  • Coordination of ceiling access works around staff occupancy
  • Full testing and commissioning of all equipment

The project was completed within the planned six working day programme.

 

The Result

Both first floor offices in Beaumont Leys, Leicester are now equipped with properly specified, efficient Daikin air conditioning systems that match their individual size, use and occupancy.

Office one is served by a correctly sized 5kw VRV cassette, relocated from the original open-plan installation and repiped to the VRV BS box, providing consistent, efficient comfort without the short-cycling and energy waste that came with the oversized 10kw unit. The new wall-mounted controller gives occupants straightforward, direct control over their environment.

Office two, which previously had no climate control provision, now has a fully independent 5kw Daikin single split system delivering reliable cooling and heating from a clean, considered installation.

In both offices, 600×600 ceiling tile cassettes have been used, matching the profile of the other small offices within the building and ensuring a consistent, professional finish throughout the floor.

Disruption to the wider building was kept to a minimum throughout, with staff relocated only during the ceiling access phases and the programme maintained from start to finish.

For Newton Electrical & Mechanical Ltd, this project reflects what careful planning, accurate equipment selection and considered installation can achieve in a working commercial environment: practical, professional and properly delivered.

 

Conclusion

This first floor office air conditioning installation in Beaumont Leys, Leicester demonstrates Newton Electrical & Mechanical Ltd’s ability to deliver tailored climate control solutions for commercial spaces, working within occupied buildings and tight programmes without compromising on quality or finish.

By reconfiguring the existing Daikin VRV system, right-sizing and relocating the cassette into office one, installing a new independent unit for office two, and specifying 600×600 ceiling tile cassettes throughout, we created a solution that matched both the technical requirements and the visual standard of the building, delivered within a six working day programme with minimal disruption to the business.

If you are planning a commercial office air conditioning installation or need climate control added to newly created or reconfigured workspaces in Leicester or the surrounding area, Newton Electrical & Mechanical Ltd can help from initial design through to commissioning.

Get in touch to discuss your requirements.